Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding

Product Details
Customization: Available
state: Solid
pH: Alkaline
Still deciding? Get samples of US$ 0.2/kg
Request Sample
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (17)
  • Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding
  • Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding
  • Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding
  • Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding
  • Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding
  • Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding
Find Similar Products
  • Overview
  • Product Description
  • Strict quality testing
  • Product effect display
  • applied range
  • Custom process
  • Packaging & Shipping
  • qualification certificate
Overview

Basic Info.

Type
Organic
Melting Point
>600℃
Chemical Composition
SiO₂=10%-30%
Function
Remove Oxides, Protect Weld Metal
Application
Submerged-arc Welding
Manufacturing Method
Smelting
Transport Package
Pack Each Cubic Meter Together
Origin
Luoyang City, Henan Province
Production Capacity
20, 000 Tons Per Year

Product Description

Product Description

Product Name:
HW811 (pressure-bearing) SAW FLUX
Specifications and Compliance:
NB47018-2018
GB/T 5293-2018  S49A4UFB-SU34     S55A4UAB-SU1M3   
AWS A5.17   F7A4-EH14  
AWSA5.23   F5A4-EA2
General Information:
Basicity:1.6 
Grain size:10-40 mesh, 12-60 mesh
Density: 1.2g/cm3

Application:
Phoenixweld HW811 (pressure-bearing) can be used for multi-layer double-sided single-pass welding and double wire welding. It can also be used for welding of low alloy structural steel in pressure vessels, bridges, ships,machinery, etc.

Mechanical Properties: 

Flux/Wire Combination

Rm (Mpa)

ReL / Rp0.2
(Mpa)

A (%)

V-groove Impact

-20ºC(J)

-40ºC(J)

SU34

530

420

29

/

85

SU1M3

585

490

25

/

75

Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding
Notes:

1.Re-dry the flux at 300-350ºC for 60 minutes before welding.
2.Remove rust, water scale, primer and other contaminants on the base metal before welding to obtain excellent weld deposit.
3.Add new flux regularly before using the recycled flux to prevent defective weld bead.
Package:
25kg/moisture repellent bag,25kg/bucket,400kg/bulk bag
For special package, please contact us.

 
Strict quality testing

Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding

Product effect display

Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding

applied range

Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding

Custom process

Factory Supply Welding Flux Sj301 for spiral Steel Pipe WeldingTo better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.

Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding

 
Packaging & Shipping

Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding

qualification certificate

Factory Supply Welding Flux Sj301 for spiral Steel Pipe Welding


FAQ
 1. How do you ensure your product and service quality?
All our processes strictly adhere to ISO9001 procedures.And have 12months quality warranty and exchange service against Bl issue date forthe quality problem caused by our side.

2. Canyou provide several pieces of samples for testing before place mass order?
Yes,we are pleasure to send you samples to test the quality and performance.

3. How canImake order and settle payment?
Once clear your requirement and determined which product is ideal foryou,we will send Pl to you. L/C,D/P,T/T,Paypal, Western Union etc.are allavailable.

4. lf we find your bank account different as before how should we respond?
Please DON'T arrange the payment until double check with us.(Bank details will be listed in each piece of PI)

5. What about Delivery Date?
For sample order: 3-5 days after the requirement.For mass order: 15 days after confirm order.

6. What about Shipping?
We can send the small batches by express and the mass orders by LCL orFCL condition.To save logistics cost,you can either use your own nominated shippina aaent for the shipment.
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier